|
|
Facts & Infrastructure
|
TOTAL
LAND AREA
|
|
78
Acres |
|
ZONING
|
|
Riverside
Business Park is zoned M-2 (City of Everett) |
|
|
|
Existing
permitted uses are: |
|
|
|
- Light, Medium and Heavy Manufacturing
- Distribution
- High tech/office
|
|
SOILS
|
|
Structurally
compactible, large granular dredge spoils from the main sediment
bed of the Snohomish River. Building structure support would
be developed by shallow foundations in conjunction with preloading
or other
ground improvement techniques for heavy or settlement sensitive structures. |
| |
| |
| |
| |
|
TOPOGRAPHY
|
|
Flat,
rough-graded. |
|
PHONE/FIBER
OPTICS
|
|
GTE
(fiber optics throughout park) |
|
UTILITIES
|
|
Water,
sewer, electrical, gas to site. Master stormwater system on-site. |
|
LOT
SIZES
|
|
1-78
acres, segregated via binding site plan process. |
|
LEASE
TERM
|
|
Minimum
25 years. |
|
OWNERSHIP
INTERESTS
|
|
Leasehold
or fee simple interest |
|
LEASE
RATE/SF
|
|
TBD |
|
NET
CHARGES INCLUDE
|
|
Port
of Everett leasehold tax at 12.84% of lease value, project maintenance
charge TBD. |
|
|
|
| |
INFRASTRUCTURE

|
|
|
ELECTRICITY
|
|
Snohomish
County P.U.D. Three phase 440 volt, looped system served
from 2 substations on site. 115,000 kva service available. |
| |
|
NATURAL
GAS
|
|
Eight
inch, high pressure transmission main on site. |
|
WATER
SUPPLY
|
|
City
of Everett. 3,000 gpm flow capacity, 12 inch water mainline. |
|
SEWER
|
|
City
of Everett. Eight-inch collector site. |
|
TELEPHONE
|
|
General
Telephone (GTE). Fiberoptics available. |
|
ROAD
STANDARD
|
|
All
weather roads, including a 3-lane, landscaped boulevard. |
|
FIRE
PROTECTION
|
|
Fire
flow of 3,000 gallons/minute. 5 hydrants at 300' intervals. |
|
PERMITS
|
|
Fully
master-planned and entitled land development. Additional
permits, issued byCity of Everett, required forbuilding
improvements. |
|
|
|
|
|
|
|